EY EY

Wilton Park (Dublin) Wilton Park (Dublin)

A new standard for corporate fitness in the heart of Dublin City Centre.

McSport is proud to have delivered a complete gym fit-out for EY at its Wilton Park facility, supplying and installing every element of this state-of-the-art corporate fitness space.

Bringing together premium equipment, thoughtful design and distinctive finishes, the facility provides a high-quality training environment that reflects EY's commitment to employee wellbeing and an active workplace.

Planning & Preparation

A comprehensive consultation process laid the foundations for the project, bringing together EY's vision and McSport's expertise in gym design to develop a facility tailored to the needs of a high-performance corporate workforce.

A Focus on Design & Performance

At the heart of the facility is a standout feature: McSport's first-ever rig installation in Ireland. Designed to create a versatile, high-capacity training hub, the rig provides a focal point for functional and strength-based training, offering flexibility across a range of workouts.
The wider equipment specification combines leading products from Life Fitness and Hammer Strength, alongside Concept2 rowers and SkiErgs. Each element was carefully selected to provide a comprehensive training offering, catering to a variety of fitness levels and training styles.

A Distinctive Premium Finish

A defining feature of the project is the bespoke upholstery colour selected for the equipment. A first for McSport, this unique finish introduces a distinctive touch of luxury, creating a cohesive and premium aesthetic throughout the facility.
The attention given to these finishing details helps set the space apart, demonstrating how equipment specification and design can work together to create an impressive corporate fitness environment.

Installation Process

The McSport installation team managed the complete gym fit-out, coordinating the delivery, assembly and positioning of equipment to ensure the facility was ready for handover.

Process Steps:

  1. Delivery & Inspection: All equipment was delivered to site and thoroughly inspected ahead of installation to ensure it met the required quality standards.
  2. Assembly & Placement: Equipment was assembled and positioned in accordance with the approved floor plan, with careful consideration given to spacing, safety and the overall flow of the facility.
  3. Finishing: Final details were completed to complement EY's aesthetic, including the bespoke equipment upholstery and the creation of a versatile functional training area.
  4. Final Calibration & Handover: Machines were adjusted and tested, and the completed layout reviewed to ensure everything was ready for handover to EY ahead of opening.
McSport Commercial Case Study: EY Dublin

Outcome

The completed EY gym brings together premium equipment, functional design and distinctive finishes to create an exceptional corporate fitness facility.

With McSport's first-ever rig installation in Ireland and a bespoke upholstery finish, the project showcases the team's ability to deliver tailored fitness environments that balance performance with a premium aesthetic.

Looking Ahead

With the EY Wilton Park facility now fully operational, McSport remains committed to providing ongoing support, including maintenance and flexible upgrade options as the facility evolves.

The project is another example of McSport's expertise in delivering complete corporate gym fit-outs, from initial consultation and equipment specification through to professional installation and ongoing support.

Ready to transform your space with premium fitness? McSport offers tailored solutions, expert installations, and seamless project delivery. Contact us today to start your next gym journey.

Return to:

Case Studies

Sign up & you could

Win a €500
gift card!

Join the McSport newsletter for your chance to win, plus first look at our Black Friday and Christmas deals.

*Add your mobile for SMS offers (optional, doesn't affect your entry). No purchase necessary. 18+, ROI and NI residents only. Draw closes Dec 16th, 2026 at 23:59